Data and statistics

Generation by fuel type during the period of minimum net demand (1-2 Jan) in 2030 with 15% share of VRE with flexible power plants

Open

Generation by fuel type during the period of minimum net demand (1-2 Jan) in 2030 with 15% share of VRE (ASEAN RE) with flexible power plants - Base 2030

Open

Annual total (left) and per capita (right) electricity generation in Asia and the EU28

Open

Average auction prices for solar PV by region and commissioning date, 2016-2022

Open

Average auction price for wind, by region and commissioning date, 2016-2022

Open

Electricity generation by source in Southeast Asia, 2000-2022

Open