Data and statistics

Average hydropower generation over a day in Thailand in the three different scenarios, 2030

Open

Average hydropower generation between 3pm and 5pm in Thailand in the three different scenarios, 2030

Open

Generation by fuel type during the period of minimum net demand (1-2 Jan) in 2030 with 15% share of VRE with flexible power plants

Open

Yearly evolution of minimum-take capacity in all contracts in Thailand, 2019-2049

Open

Generation by fuel type during the period of minimum net demand (1-2 Jan) in 2030 with 15% share of VRE (ASEAN RE) with flexible power plants - Base 2030

Open