India 175 GW Renewable Energy Target for 2022
In 2015 India’s Ministry of New and Renewable Energy adopted new renewable energy target of 175 GW to be achieved by 2022. The majority of the targeted capacity is to come from solar PV – 100 GW, followed by 60 GW from wind and residue capacity split between biomass (10 GW) and small hydropower stations (5 GW).
Prior 2015, the solar PV capacity target for 2022 was 20 MW.
India established tentative state targets braked down by technology (to see those, please see above link). The regional technology targets are as follow
Region
PV (MW)
Wind (MW)
Small Hydro Power (MW)
Biomass (MW)
Northern Region
31120
8600
2450
4149
Western Region
28410
22600
125
2875
Southern Region
26531
28200
1675
2612
Eastern Region
12237
135
244
North Eastern Region
1205
615
All India
99533
60000
5000
10000
Prior 2015, the solar PV capacity target for 2022 was 20 MW.
India established tentative state targets braked down by technology (to see those, please see above link). The regional technology targets are as follow
Region
PV (MW)
Wind (MW)
Small Hydro Power (MW)
Biomass (MW)
Northern Region
31120
8600
2450
4149
Western Region
28410
22600
125
2875
Southern Region
26531
28200
1675
2612
Eastern Region
12237
135
244
North Eastern Region
1205
615
All India
99533
60000
5000
10000
Want to know more about this policy ? Learn more