Peru Renewable Energy Auctions

Source: International Energy Agency
Last updated: 25 June 2025

Since 2009 Peru has held renewable-energy auctions for grid connected generation and for off-grid electrification, based on the framework established by Law No. 28832 of 2006 and Decree 1002 of 2008.


The following table provides a summary of auctions in Peru. The amount of electricity (GWh) auctioned in each call is calculated according to the projected needs to meet the national 5% target minus the renewable energy (other than hydro) already contracted. Auctions are technology specific and have a non-disclosed price-cap per technology, with offers above the cap automatically disqualified.












































































































Auction



Date



Type



Wind


(GWh/yr)



Solar


(GWh/yr)



Biomass


(GWh/yr)



Hydro*


(GWh/yr)



4th RE auction



Feb-16



Required



1300



450



Awarded



738.6



523.4



29



448.2



3rd RE auction



Aug-13



Required



0



0



0



1300



Awarded



N/A



N/A



N/A



1278 (240 MW)



2nd RE auction



Apr-11



Required



419



43



593



681



Awarded



416



43



14



680 (102 MW)



1st Auction, 2nd call



Mar-10



Required



0



8



419



338 MW



Awarded



N/A



0



11.7 (1.5MW)



92 (19 MW)



1st Auction, 1st Call



Oct-09



Required



320



181



813



500 MW



Awarded



571



173



143



161 MW



1st off-grid RE auction



Nov-14


   

**


   

*  only hydro < 20MW is considered renewable as per Decree 1002 of 2008



**500000 systems of varying capacity from 80W to 1kW. 



 