Maharashtra Renewable Energy Policy 2015
The Maharashtra Renewable Energy Policy 2015 set ambitious targets for different renewable energy sources defined as follow:
Power Projects
Target (MW)
Wind power projects
5000
Sugarcane waste/Agricultural remedial projects
1000
Small hydro
400
Agricultural waste power generation project
300
Industrial waste power generation project
200
Solar power project
7500
The following incentives will be given for specific power projects:
Permission for re-powering wind generators;
Land acquired for commissioning wind projects will be deemed non-agricultural land;
Exemption from various taxes and duties for sugarcane projects having a capacity more than 3 MW;
Open access granted for interstate and intrastate solar projects as per MERC regulations;
Solar projects can register themselves as industrial units.
Power Projects
Target (MW)
Wind power projects
5000
Sugarcane waste/Agricultural remedial projects
1000
Small hydro
400
Agricultural waste power generation project
300
Industrial waste power generation project
200
Solar power project
7500
The following incentives will be given for specific power projects:
Permission for re-powering wind generators;
Land acquired for commissioning wind projects will be deemed non-agricultural land;
Exemption from various taxes and duties for sugarcane projects having a capacity more than 3 MW;
Open access granted for interstate and intrastate solar projects as per MERC regulations;
Solar projects can register themselves as industrial units.