Resolution on met-metering

Source: International Energy Agency
Last updated: 25 June 2025

The Resolution issues technical specification for grid connection and includes a template for power production contracts for Renewable Energy Sources and Medium size Cogeneration Systems. The resolution allows net metering for small-scale (10kW residential and 30kW commercial; low voltage, <1kV) and medium scale (<500kW; medium-voltage 1-69kV) generators.


Net metering balances over a period of 12 months.

Want to know more about this policy ? Learn more