Long-term Power Purchase Agreements (PPAs) for renewable energy projects
Renewable energy developers can sign long-term PPAs on a case-by-case basis with the state-owned utility (GPL). This includes an existing 25 MW biomass cogeneration plant and the planned 25MW Hope Beach wind farm. Following an 8.4kW demonstration project from Guyana Energy Agency, long-term PPAs are also being considered for grid-connected solar PV
Want to know more about this policy ? Learn more