Auction for 1.2 GW of cogeneration capacity (2nd call)
Auctions for 1.2 GW of co-generation between 2025 and 2027 (400 MW to be auctioned every year). Additional costs from benefits received by these cogeneration units will be passed on to the system costs and are expected to be EUR 295-530 million/yr. Gas co-generation should be ready to consume at least 10% renewable hydrogen. Minimum size of 100 MW
Want to know more about this policy ? Learn more
Topics
Policy types