Signalling of Charging Stations with access from the RCE (Phase 1)
In the context of adaptation to climate change, decarbonisation and the promotion of sustainable mobility, and with the aim of improving the visibility and accessibility of charging infrastructure for electric vehicles, the DGC has decided to proceed with the ex officio signalling of certain Charging Stations with access from the RCE. In the first phase (Phase 1), charging stations accessible from roads of the Trans-European Basic Network and from the A-6 motorway (a road that, despite belonging to the Global Network, is considered very relevant) will be signposted.
Want to know more about this policy ? Learn more