Renovation of buildings outside Policy Objective 2 - Greener Low Carbon Europe (P SK)

Source: International Energy Agency
Last updated: 30 May 2025
The renovation of public buildings will be supported from policy objectives 1, 3 – 5 of the Slovakia Programme, with the exception of the measure "Reducing the energy performance of public buildings" from policy objective 2. A contribution is also expected from the renovation of cultural buildings, for which €120 million has been allocated, as well as from the renovation or construction of healthcare centres. It is assumed that measures implemented through policy objective 5 will also contribute to the savings.

Want to know more about this policy ? Learn more