Country:Spain
Year:2000
Policy status:Superseded
Date Effective:2000
Date Ended:2011
Policy Type:Economic Instruments
Policy Target:
Policy Sector:Electricity
Size of Plant Targeted:Small
Agency:Ministry of Industry, Energy and Tourism
URL:https://www.boe.es/boe/dias/2000/09/30/pdfs/A33511-33515.pdf
Description:

The Directorate General for Energy Policy and Mines drafted a standard contract and invoice for solar PV installations connected to low voltage grids. The Royal Decree (1663/2000) applies to photovoltaic installations of nominal power not more than 100 kVA and whose connection to the distribution grid is carried out in low voltage, i.e., not higher than 1 kV. If the nominal power of a photovoltaic installation to be connected to the distribution grid is more than 5 kW, the connection to the distribution grid will be triphasic, through three-phase inverters. This connection could be made through one or various single-phase inverters at each phase, with power less than 5 kW.