Country:Serbia
Year:2009
Policy status:Superseded
Jurisdiction:National
Date Effective:2009
Date Ended:2012 (December 31st)
Policy Type:Economic Instruments>Fiscal/financial incentives>Feed-in tariffs/premiums
Policy Target:Multiple RE Sources, Multiple RE Sources>Power
Policy Sector:Electricity
Agency:Ministry of Mining and Energy (2009-2011), Ministry of Infrastructure and Energy (2011-2012) Department for RES
URL:http://www.ssl-link.com/mre/cms/mestoZaUploadFajlove/Decree_on_feed_in_tariffs_-_OJ_99-2009.pdf
Description:

Tariffs apply to renewable energy plants range over a 12-year period.

The right to incentives for electrical energy produced in power plants using non accumulated solar energy is limited to the sum of installed capacities in all such power plants of 5 MW and for electrical energy produced in power plants using wind energy is limited to the sum of installed capacities in all such power plants of 450 MW.

Hydro power plants:

  • up to 0.5 MW: 9.7 EUR cents/kWh,
  • from 0.5 MW to 2 MW: 10.316 – 1.233*P EUR cents/kWh,
  • from 2 MW to 10 MW: 7.85 EUR cents/kWh;

Biomass power plants:

  • up to 0.5 MW: 13.6 EUR cents/kWh,
  • from 0.5 MW to 5 MW: 13.845 – 0.489*Р EUR cents/kWh,
  • from 5 MW to 10 MW: 11.4 EUR cents/kWh;

Biogas power plants:

  • up to 0.2 MW: 16.0 EUR cents/kWh,
  • from 0.2 MW to 2 MW: 16.444 – 2.222*Р EUR cents/kWh,
  • over 2 MW: 12.0 EUR cents/kWh;

Landfill and sewage gas power plants: 6.7 EUR cents/kWh;

Wind power plants: 9.5 EUR cents/kWh;

Solar power plants: 23 EUR cents/kWh;

Geothermal power plants: 7.5 EUR cents/kWh;

Fossil fuel-fired CHP plants:

  • up to 0.2 MW: 10.4 EUR cents/kWh,
  • from 0.2 MW to 2 MW: 10.667–1.333*Р EUR cents/kWh,
  • from 2 MW to 10 MW: 8.2 EUR cents/kWh;

Waste-fired power plants:

  • up to 1 MW: 9.2 EUR cents/kWh,
  • from 1 MW to 10 MW: 8.5 EUR cents/kWh.

P represents the installed capacity of the plant expressed in MW.

 

 

 

 

 

Related policies:Decree on the Requirements for obtaining the Status of the Privileged Power Producer and the Criteria for Assessing Fulfilment of these Requirements
This record is superseded by:Decree on Incentive Measures for Privileged Energy Producers (RS Official Gazette, No. 8/13)

Last modified: Tue, 20 May 2014 15:19:16 CEST