Country:Mexico
Year:2010 (April)
Policy status:In Force
Jurisdiction:National
Date Effective:2010 (April)
Policy Type:Regulatory Instruments>Codes and standards
Policy Target:Hydropower
Policy Sector:Electricity
Size of Plant Targeted:Large
URL:http://dof.gob.mx/nota_detalle.php?codigo=5139811&fecha=20/04/2010
Legal References:RESOLUCION Núm. RES/065/2010
Description:

The resolution sets the rules for interconnection of large hydropower plants (>30MW). These power plants are not considered in the LAERFTE and thus require a separate regulation. This resolution includes methods of calculating payments obliged by the contract.

 

Last modified: Mon, 30 Nov 2015 19:10:45 CET