Country:Israel
Year:2009 (adjusted 2011)
Policy status:Ended
Jurisdiction:National
Date Effective:2009 (adjusted 2011)
Date Ended:2013
Policy Type:Economic Instruments>Fiscal/financial incentives>Feed-in tariffs/premiums
Policy Target:Energy Sector
Agency:Public Authority Utility and Ministry of National Infrastructure
URL:http://www.wind-works.org/FeedLaws/Israel/renewable%20tariffs%20Israel%202009.pdf
Description:

In July 2011, the Public Utilities Authority adjusted solar PV feed-in tariffs and extended the remuneration scheme to ground-mounted systems above 12 MW for connection to high-voltage grid. Tariffs have been set and adjusted as follows: - For rooftop PV systems up to 50 kW f, the FIT is ILS 1.51/kWh, tariff valid for a twenty-year period up to a 120 MW cap. The government approved an additional 110 MW through 2014 but new tariff levels are yet to be decided. - For rooftop and ground-mounted PV systems between 51 kW and 12MW, the tariff is ILS 1.44/kWh until 50MW or end of 2011, ILS 1.37/kWh until an additional 65 MW or by end 2012, ILS 1.30/kWh until an additional 85 MW or end 2013 and ILS 1.23/kWh until an additionnal 100 MW or end 2014. The total cap therefore adds up to 300 MW. - For ground-mounted solar systems between 12 and 60 MW, the tariff is ILS 1.08/kWh over a twenty year-period and up to a 400 MW installed capacity cap.

Last modified: Fri, 25 Aug 2017 16:27:36 CEST