Country:Indonesia
Year:2014 and 2015
Policy status:In Force
Jurisdiction:National
Date Effective:2014 and 2015
Policy Type:Economic Instruments>Fiscal/financial incentives>Feed-in tariffs/premiums
Renewable Energy Policy Targets:Bioenergy, Biomass for power
Policy Sector:Electricity
Size of Plant Targeted:Small and Large
Agency:Ministry of Energy and Mineral Resources
URL:http://prokum.esdm.go.id/permen/2014/Permen%20ESDM%2027%202014.pdf
Legal References:Ministerial Regulation No. 27/2014 and No. 44/2015
Renewable Energy Description:

Ministerial Regulation No. 27/2014 on feed-in tariffs for bioenergy projects replaces Ministerial Regulation No. 19/2013. Effectively, the remuneration levels are increased both for biomass and biogas generators. Only projects under 10 MW capacity are eligible for the support and benefit from the obligation purchase rule.

Voltage

Technology

Feed-in tariff level Rp/kWh

Medium Voltage

Biomass

1.150

Biogas

1.050

Low Voltage

Biomass

1.500

Biogas

1.400

Tariffs are not adjustable for inflation or exchange rate variations.

Variable price multiplier is available for projects depending on their location:

  • Java Island: F = 1.00
  • Sumatra Island: F = 1.15
  • Sulawesi Island: F = 1.25
  • Bali, Bangka-Belitung, Lombok: F = 1.5
  • Kalimantan Island: F = 1.30
  • Riau Archipelago, Papau and rest: F = 1.6

Ministerial Regulation No. 44/2015 replaces 2013 tariff levels and denominates them in USD.

Voltage

Technology

Feed-in tariff level USDcents/kWh

Medium Voltage

Municipal Solid Waste – thermal process

13.14 - 18.77

Municipal Solid Waste – landfill and anaerobic digestion

16.55

Low Voltage

Municipal Solid Waste – thermal process

22.43

Municipal Solid Waste – landfill and anaerobic digestion

20.16

 

This record supersedes:Feed-in-Tariffs for Biomass (Ministerial Regulation No. 19/2013)

Last modified: Mon, 29 Aug 2016 10:01:17 CEST