Country:India
Year:2015 (Feb 26th)
Policy status:In Force
Jurisdiction:State/Regional
Date Effective:2015 (Feb 26th)
Policy Type:Economic Instruments>Fiscal/financial incentives>User charges, Regulatory Instruments
Policy Target:Solar>Solar photovoltaic, Solar>Solar photovoltaic>Residential
Policy Sector:Electricity
URL:http://rerc.rajasthan.gov.in/Regulations/Order84.pdf
Description:

The net metering policy for Rajasthan went into force on 26th of February 2015. The eligible parties installing rooftop PV installations are allowed to benefit from the net metering tariff of INR 7.5 per installed unit.

The policy restricts the cumulative installation that can take place at any particular distribution transformer to 30% of the transformer's capacity. There are also restrictions on the size of the rooftop plant that can be set up by an individual consumer: it cannot exceed 80% of the sanctioned connected load. The lower threshold for the plant size is pegged at 1kW and the upper limit is 1MW.

Last modified: Fri, 17 Feb 2017 15:30:42 CET